SRB / PORTFOLIO · REV.02
SHEET00INDEX
X0000Y0000SCROLL000%
BCN --:--

Souvik Ray Baruah

My journey as a professional architect began on site, where I was exposed to construction and execution of proposed design on paper. My experience on site led me to understand the importance of developing systems rather than just design, and to move towards an era of AI-integrated workflows.

MASTERIAAC · Master of Advanced Architecture · 2025–27
B.ARCHNIT Trichy · First class · 2019–24
SITEL&T Construction · Graduate architect trainee · 2024–25
OFFICE2+ Design Collaborative · Intern · 2023
Faceted parametric tower, half wireframe mesh and half 3D-printed model

Work

LAYERS
IDLAYERTYPEYEAR◉
01InBetween: Housing for 2050
Barcelona · group
ACADEMIC2025
02Symphony: Football Stadium
Bengaluru · thesis
ACADEMIC2023–24
03Robotics for Ecological Building
Barcelona · group
ACADEMIC2026
04West Block 4, Knowledge City
Vadodara · L&T
PROFESSIONAL2024–25
05Internship
Mysuru · 2+ DC
PROFESSIONAL2023
Project preview
InBetween · aerial render · IAAC T1
01
PROJECTInBetween: Housing for 2050
CLIENT / CONTEXTIAAC · Term 1 · Group
LOCATIONBarcelona, ES
SCALENTS
REVA

InBetween: Housing for 2050

ROLES computational logic building · Ladybug analysis · Rhino 3D modelling · physical prototyping
Aerial render of timber housing modules and green rooftops between Barcelona blocks
fig.01.1Aerial view: the modular living layer threaded between existing blocks.

Brief

A transitional housing system for people arriving in Barcelona for work or study: students, young professionals and temporary workers. It responds to the demand for short-term and interim living in a city under demographic and housing pressure.

The system inserts a modular, temporary living layer in between existing urban blocks, activating underused spaces without permanent construction.

Concept diagram of the InBetween system
fig.01.2Concept: cohesion, adaptability, greenery and rapid construction around one modular system.

Growth logic

The housing grows in stages from fixed cores: an offset from the existing block, a public courtyard at the centre, then levels 1 to 3 around the shafts, ending with green roofs to mitigate heat.

GROWTH PATTERN01 / 07

STAGE 01

Offset + Cores
    UNIT ARRANGEMENT
    Level 1 unit arrangement Level 2 unit arrangement Level 3 unit arrangement
    Unit combinations: life module, service module and service space
    keyUnit combinations on a 1.5 m module.
    SOLAR ANALYSIS · SUMMER SOLSTICE
    Solar analysis of the existing block
    ExistingNeed for an intervention
    Solar analysis with the proposed intervention
    ProposedIntervention within the block
    Solar analysis of the proposed intervention
    ProposedIntervention, isolated
    Growth logic flowchart
    fig.01.3Pseudo code: boundary offset → shafts → voxels → Ladybug objectives.

    Parameters

    ACCESS + PLACEMENT
    1. Main access fixed from the shafts leading to the alleyways on ground level.
    2. Offset from existing buildings: 9 m.
    3. Minimum height from the ground: 13 m.
    4. Shafts connect to form the access.
    5. Communal space at the centre.
    6. All services and access around the shafts.
    INCREMENT
    1. A housing unit = at least 1 living unit + 1 service unit.
    2. Living units accessed through the service unit.
    3. All windows face outwards.
    4. When a floor reaches its boundary, the next floor grows along the shaft.
    5. The intervention connects to the surrounding buildings and city.
    6. Rooftops are always green and public.

    Joinery

    At every intersection a cruciform connector joins the corners of four adjacent modules into one node. Module corners are chamfered to leave room for the connector and keep the junction compact; a vertical member runs through the node and carries load down the stack.

    Section drawing
    fig.01.6Section through stacked living and service units.
    Isometric of one block unit
    fig.01.7Isometric: 1 block unit.
    Isometric of the cruciform joint
    fig.01.8Isometric: cruciform joint.
    Living system drawing
    fig.01.9Living system: how each block is connected.
    Cruciform joint detail
    fig.01.10Joint detail of the cruciform connector.

    Kit of parts

    Each home splits into wall types: service, living and bed walls. Service units hold the wet core of WC, basin and kitchenette and act as the entrance; living units carry built-in storage and shelving, keeping the floor free. A communal dining space sits at the centre of each cluster.

    Wall A: openings
    Perspective line drawing
    fig.01.11Perspective: the modules and their cruciform joints inside the block.
    02
    PROJECTSymphony: Football Stadium
    CONTEXTB.Arch thesis · NIT Trichy
    LOCATIONBengaluru, IN
    DATE08.2023–05.2024
    REVA

    Symphony: Football Stadium

    CAPACITY 50,000SITE 240,000 m²CLUB Bengaluru FC
    Stadium render
    fig.02.1Exterior: the bowl wrapped in a wave of vertical chimes.

    Façade

    The façade wraps the bowl in "chimes": vertical elements hung in overlapping layers, forming a porous skin that filters light and air.

    CHIMESIllustrative
    ELEMENTS0
    POROSITY0%
    Exploded axonometric
    fig.02.2Exploded axo: foundation grid → columns → bowl → roof trusses.
    Elevation concept
    fig.02.3Elevation: concept development.
    Section of the main stand
    fig.02.4Typical section of the main stand.

    Site layout

    With 50,000 spectators, circulation drove the plan. Studies of user typology and commuting shaped the 240,000 m² site; pedestrian and vehicular access are segregated, and paths are broken down so no one circles the whole campus on one route.

    Site plan
    fig.02.5Site plan.
    Pedestrian circulation
    fig.02.6Pedestrian circulation.
    pedestrianvehiculargreen belts
    Vehicular segregation
    fig.02.7Vehicular segregation.
    gates + securitypublicplayers, media, VIP

    Floor plans

    The upper ground level is the operational core, with separate entries for players, media and VVIP guests beside a club museum, store, café and sport bar off a double-height reception. The podium level adds sideline lounges and a social block with a banquet hall, sport bar and football turf.

    Podium-level plan
    fig.02.8Podium-level floor plan.
    Upper ground-level plan
    fig.02.9Upper ground-level floor plan.
    03
    PROJECTRobotics for Ecological Building
    CONTEXTIAAC research studio · T2–T3
    LOCATIONBarcelona, ES
    MATERIALStraw, no binder
    REVA

    Robotics for Ecological Building

    RESPONSIBILITIES robotic logic drawing · documentation of the robotic process
    Robot arm spraying straw
    fig.03.1The robot arm with pneumatic end-effector spraying straw onto the frame.

    Research

    Straw is one of the most plentiful agricultural by-products, yet it is often burnt or thrown away. Using an industrial robot fitted with a pneumatic end-effector, the team sprayed straw onto a pinned plywood frame, building a partition layer by layer along a digitally planned path, with no glue or binder.

    Prototype section drawing
    fig.03.2Prototype 1 section: 50 mm pins at 50 mm spacing.
    Side view after spraying
    fig.03.3Side view after spraying.
    Toolpath elevation
    fig.03.4Front elevation: the Grasshopper toolpath.
    Front view after spraying
    fig.03.5Front view: straw settled along the diagonal path.
    FRAME1200 × 2200
    PINS50 @ 50 mm
    STRAW / RUN1,000 g
    RETAINED20%

    Final prototype

    The final prototype replaces fixed panels with a field of branched poles. A modified leaf-blower end-effector shreds loose straw and blows it onto the 15° sticks of each pole, where friction alone holds the fibres. Poles can be moved and re-sprayed, so IAAC's spaces can be reshaped: a low-carbon, acoustically absorbent partition.

    End effector
    aEnd effector
    Single pole
    bSingle pole, 1:10
    Fibre interlock
    cFibre interlock
    Spatial application
    dSpatial application
    04
    PROJECTWest Block 4, Knowledge City
    CONTRACTORLarsen & Toubro Construction
    LOCATIONVadodara, IN
    ROLEGraduate architect trainee
    REVA

    West Block 4, Knowledge City

    TYPOLOGY IT campus office · design-build
    Completed office building
    fig.04.1West Block 4 on completion.
    FLOORSB2+B1+G+8
    BUILT-UP AREA~32,000 m²
    OCCUPANCY~1,900
    ON SITE08.24–06.25

    Tenure

    A year spent where the drawings meet the building: checking quantities against site conditions, quality checks on openings and finishes, weekly floor-by-floor progress documentation, IGBC green-building documentation and the site landscape.

    JUL 2024
    PHASE 1 / 6

      JULAUGSEPOCTNOVDECJANFEBMARAPR

      Drag to scrub

      05
      PROJECTInternship
      OFFICE2+ Design Collaborative
      LOCATIONMysuru, IN
      DATE01–06.2023
      REVA

      Internship

      ROLE architectural intern · residential, commercial and masterplan projects

      Practice

      Six months at 2+ Design Collaborative were my first time in practice. I worked from early concept to construction: drafting conceptual floor plan layouts and preparing good-for-construction (GFC) drawings for interior fit-out details in Rhino and AutoCAD.

      Clubhouse floor plan
      fig.05.1Conceptual floor plan layout.
      GFC interior drawing
      fig.05.2GFC drawing: interior fit-out detail.
      06
      DOCUMENTCurriculum vitae
      NAMESouvik Ray Baruah
      BASEDBarcelona, ES
      STATUSMAA02 student
      REVA

      CV

      EDUCATION

      Institute for Advanced Architecture of CataloniaBARCELONA · 09.2025 – 07.2027 (EXP.)

      Master of Advanced Architecture (MAA02). Design research studio: Robotics for Ecological Buildings.

      National Institute of TechnologyTIRUCHIRAPPALLI · 07.2019 – 07.2024

      Bachelor of Architecture. First-class degree.

      EXPERIENCE

      Larsen & Toubro ConstructionVADODARA · 08.2024 – 06.2025

      Graduate architect trainee; site-based design coordinator.

      2+ Design CollaborativeMYSURU · 01.2023 – 06.2023

      Architectural intern; residential, commercial and masterplan projects.

      SOFTWARE

      FABRICATION

      3D PRINTINGCNCLASER CUTTINGROBOTICS

      COMPETITIONS

      GSen Trophy · NASA 2022TEAM HEAD

      National Association of Students of Architecture.

      ANDC Trophy · NASA 2021CO-HEAD

      National Association of Students of Architecture.

      BRICK Awards 24ILLUSTRATOR · 2023

      As a member of 2+ Design Collaborative.

      07
      DOCUMENTContact
      EMAIL[email protected]
      SOCIALLinkedIn
      TZCET
      REVA

      Contact

      srb@portfolio:~$ contact --email
      → [email protected]
      srb@portfolio:~$ contact --linkedin
      → linkedin.com/in/souvik-ray-baruah
      srb@portfolio:~$